1. Initial design and process meeting


We visit your Home, land or even your favourite café to discuss and document your ideas, requirements, plans and budgets.

At this stage prior to progressing further we require a surveyor to prepare a Detail Survey (also known as a Contour Survey) of your property showing the features and structures (buildings, driveways, walls, trees, creeks etc.) on the land (and possibly the neighbouring land as well). A Detail Survey shows the existing features and structures within and adjacent to a parcel of land and allows TR Building Solutions, Architect / Draftsperson to assess the site and design your home. Council also require a Detail Survey Plan as part of a (DA) Development Application or (CDC) Complying Development Certificate.

A CDC is a streamlined approval process that allows you to avoid the complicated and lengthy Council Development Application process




2. Concept and design of your new home


Design and briefing meetings are held with the architectural designer / draftsperson to develop your brief.

From these meetings your concept design and initial cost estimate is prepared, presented and amended if necessary. Preliminary drawings are issued for review, multiple revisions and meeting may be required before we start Working Drawings.

This is the most essential stage of any building or renovation, from this outcome and eventual cost, it the chance to identify your core goals, set an accurate budget and timeline and discuss all the options available to you.




3. Acceptance of estimate and final plan preparation


On acceptance of the estimate, your house plans will be prepared finalised by the architect or draftsperson.

Your selections are documented in the addendum to specification and your working drawings are prepared, presented and finalised




4. Contract documents and council building approval


A Fixed Price Contract or a Cost-Plus Contract is prepared and presented to you for approval depending on your preference. The benefits of each will be explained in detail.

Once you are satisfied, the contract documents, including the building contract, working drawings, specification and any relevant documentation are signed. We will prepare and lodge with Council the building application. A full list of required documents are detailed below.

As the works will be over $20,000.00 we will submit an application to our insurance broker being the Master Builders association of NSW (Insurance Division) who will then lodge with Icare (the current and only insurer) and a certificate will be issued in accordance with the Home Building Act. No building works can commence before this being received.




5. Colour selection/finishes


Whilst your plans are in Council, you select the colours and finishes for your new home.

Kitchen designers, landscape designers and colour consultants are available to assist and guide you with your specific requirements.




6. Construction and project management


Construction of your new home will commence soon after a construction certificate is issued and a certificate of insurance is issued by the Home Building Compensation Fund is issued if not already received, at which stage a build start date is determined and an indicative timeline presented. Weekly site meeting are encouraged and will be held with you and the Project Manager.




7. Completion


On completion you’re your extension will be professionally cleaned, a thorough quality check will be completed, and the final Council or private certifier inspection will be arranged. TR Building Solutions Project Manager will meet you for a final site inspection.

Once all parties are satisfied, we will meet you at your home to present you with the keys along with an information pack about the house and product warranties.

TR Building Solutions will explain the maintenance period and the conditions of your Warranties.




If you are wondering what happens through each stage of the building process, here are the basic steps to completing your new home.






Structure Works

We offer a complete structure package to ensure your Home or Building has a solid and compliant structure, TR Building Solutions can complete as much or as little as required.


Click on the below for further information or contact us directly.




1. For Owner BuildersFor Owner Builders


We offer a complete Structure package from Bulk excavation to detailed, Shoring, Underpinning, Piering, Footings, Formwork, Reinforcement, Concrete Placement and Finishing Including coordinating services, Brick / Blockwork, Suspended Formwork, Reinforcement, Concrete Placement and Finishing including coordinating services, Structural Steel, Framing and Scaffolding using our own equipment to ensure your structure is built efficiently and correctly

TR Building Solutions can complete as much or as little as required. TR Building Solutions can supply all, some or none of the material depending on your needs, further information can be provided.




2. For ResidentialBuilders and Architects and Engineers


We offer a complete Structure package to take away any pressure you may be under due to concurrent works, staffing issues or any reason.

From Demolition, Bulk excavation to detailed, Shoring, Underpinning, Piering, Footings, Formwork, Reinforcement, Concrete Placement and Finishing Including coordinating services, Brick / Blockwork, Suspended Formwork, Reinforcement, Concrete Placement and Finishing including coordinating services, Structural Steel, Framing and Scaffolding using our own equipment to ensure your structure is built efficiently and correctly.

TR Building Solutions can complete as much or as little as required. TR Building Solutions can supply all, some or none of the material depending on your needs, further information can be provided.




3. For Builders High Rise / Commercial


With a team accustomed to working with sticked Building rules pertaining to noise and access, parking to name but a few including out of hours works.

We offer a complete structure package from Demolition, Concrete Cutting, Structural Steel, Form Reo Pour Including coordinating services, brick / blockwork, Suspended works using our own equipment.

TR Building Solutions can complete as much or as little as required. TR Building Solutions can supply all, some or none of the material depending on your needs, further information can be provided.





Extensions

1. Initial design and process meeting


We visit your Home, land or even your favourite café to discuss and document your ideas, requirements, plans and budgets.

At this stage prior to progressing further we require a surveyor to prepare a Detail Survey (also known as a Contour Survey) of your property showing the features and structures (buildings, driveways, walls, trees, creeks etc.) on the land (and possibly the neighbouring land as well). A Detail Survey shows the existing features and structures within and adjacent to a parcel of land and allows TR Building Solutions, Architect / Draftsperson to assess the site and design your home. Council also require a Detail Survey Plan as part of a (DA) Development Application or (CDC) Complying Development Certificate.

A CDC is a streamlined approval process that allows you to avoid the complicated and lengthy Council Development Application process




2. Concept and design of your Extension


Design and briefing meetings are held with the architectural designer / draftsperson to develop your brief.

From these meetings your concept design and initial cost estimate is prepared, presented and amended if necessary. Preliminary drawings are issued for review, multiple revisions and meeting may be required before we start Working Drawings.

This is the most essential stage of any extension, from this outcome and eventual cost, it the chance to identify your core goals, set an accurate budget and timeline and discuss all the options available to you.




3. Acceptance of estimate and final plan preparation


On acceptance of the estimate, your plans will be prepared and finalised by the architect or draftsperson.

Your selections are documented in the addendum to specification and your working drawings are prepared, presented and finalised




4. Contract documents and council building approval


A Fixed Price Contract or a Cost-Plus Contract is prepared and presented to you for approval depending on your preference. The benefits of each will be explained in detail.

Once you are satisfied, the contract documents, including the building contract, working drawings, specification and any relevant documentation are signed. We will prepare and lodge with Council the building application. A full list of required documents are detailed below.

As the works will be over $20,000.00 we will submit an application to our insurance broker being the Master Builders association of NSW (Insurance Division) who will then lodge with Icare (the current and only insurer) and a certificate will be issued in accordance with the Home Building Act. No building works can commence before this being received.




5. Colour selection/finishes


Whilst your plans are in Council (If Required or with the private Certifier), you select the colours and finishes for your extension.

Kitchen designers, landscape designers and colour consultants are available to assist and guide you with your specific requirements depending on the scope of the extension.




6. Construction and project management


Construction of your new Extension will commence soon after a construction certificate is issued and after a certificate of insurance is issued by the Home Building Compensation Fund if not already issued, at which stage a build start date is determined and an indicative timeline presented. Weekly site meeting are encouraged and will be held with you and the Project Manager.




7. Completion


On completion you’re your extension will be professionally cleaned, a thorough quality check will be completed, and the final Council or private certifier inspection will be arranged. TR Building Solutions Project Manager will meet you for a final site inspection.

Once all parties are satisfied, we will meet you at your home to present you with the keys along with an information pack about the house and product warranties.

TR Building Solutions will explain the maintenance period and the conditions of your Warranties.




If you are wondering what happens through each stage of the building process, here are the basic steps to completing your Extension.






Renovations and Additions

1. Initial design and process meetin


We visit your Home, land or even your favourite café to discuss and document your ideas, requirements, plans and budgets.





2. Concept and design of your Renovation and Addition.


If Required design and briefing meetings are held with the architectural designer / draftsperson to develop your brief however these are generally held in house.

From these meetings your concept design if required and initial cost estimate is prepared, presented and amended if necessary. If required preliminary drawings are issued for review, multiple revisions and meeting may be required before we start Working Drawings.

This is the most essential stage of any extension, from this outcome and eventual cost, it the chance to identify your core goals, set an accurate budget and timeline and discuss all the options available to you.




3. Acceptance of estimate and final plan preparation


If required on acceptance of the estimate, your plans will be prepared and finalised by the architect or draftsperson.

If required your selections are documented in the addendum to specification and your working drawings are prepared, presented and finalised.




4. Contract documents


A Fixed Price Contract or a Cost-Plus Contract is prepared and presented to you for approval depending on your preference. The benefits of each will be explained in detail.

Once you are satisfied, the contract documents, including the building contract, working drawings, specification and any relevant documentation if required are signed. We will either commence works on the agreed date or if the works are over the value of $20,000.00 we will submit an application to our insurance broker being the Master Builders association of NSW (Insurance Division) who will then lodge with Icare (the current and only insurer) and a certificate will be issued in accordance with the Home Building Act. No building works can commence before this being received.




5. Colour selection/finishes


During the stages above you select the colours and finishes for your extension.

Kitchen designers, landscape designers and colour consultants are available to assist and guide you with your specific requirements depending on the scope of the Renovation or Addition.




6. Construction and project management


Construction of your Renovation or addition will commence soon after a certificate of insurance is issued by the Home Building Compensation Fund is issued, at which stage a build start date is determined and an indicative timeline presented. Weekly site meeting are encouraged and will be held with you and the Project Manager.




7. Completion


On completion you’re your Renovation or extension will be professionally cleaned, a thorough quality check will be completed, TR Building Solutions Project Manager will meet you for a final site inspection, during this inspection TR Building Solutions will present you with any keys along with an information pack about the house and product warranties.

TR Building Solutions will explain the maintenance period and the conditions of your Warranties.





If you are wondering what happens through each stage of the building process, here are the basic steps to completing your Extension.






Bathrooms, Kitchens and Laundries

1. Initial design and process meeting


We visit your Home, land or even your favourite café to discuss and document your ideas, requirements, plans and budgets.





2. Concept and design of your Bathroom, Kitchen and Laundry.


If Required design and briefing meetings are held with the architectural designer / draftsperson to develop your brief however these are generally held in house.

From these meetings your concept design if required and initial cost estimate is prepared, presented and amended if necessary. If required preliminary drawings are issued for review, multiple revisions and meeting may be required before we start Working Drawings.

This is the most essential stage of any extension, from this outcome and eventual cost, it the chance to identify your core goals, set an accurate budget and timeline and discuss all the options available to you.




3. Acceptance of estimate and final plan preparation


If required on acceptance of the estimate, your plans will be prepared and finalised by the architect or draftsperson.

If required your selections are documented in the addendum to specification and your working drawings are prepared, presented and finalised.




4. Contract documents


A Fixed Price Contract or a Cost-Plus Contract is prepared and presented to you for approval depending on your preference. The benefits of each will be explained in detail.

Once you are satisfied, the contract documents, including the building contract, working drawings, specification and any relevant documentation if required are signed. We will either commence works on the agreed date or if the works are over the value of $20,000.00 we will submit an application to our insurance broker being the Master Builders association of NSW (Insurance Division) who will then lodge with Icare (the current and only insurer) and a certificate for Home Building will be issued in accordance with the Home Building Act. No building works can commence before this being received.




5. Colour selection/finishes


During the stages above you select the colours and finishes for your extension.

Kitchen designers, landscape designers and colour consultants are available to assist and guide you with your specific requirements depending on the scope of the Renovation or Addition.




6. Construction and project management


Construction of your new Bathroom, Kitchen and Laundry will commence soon after a certificate of insurance is issued by the Home Building Compensation Fund is issued, at which stage a build start date is determined and an indicative timeline presented. Weekly site meeting are encouraged and will be held with you and the Project Manager.




7. Completion


On completion you’re your new Bathroom, Kitchen and Laundry will be professionally cleaned, a thorough quality check will be completed, TR Building Solutions Project Manager will meet you for a final site inspection, during this inspection TR Building Solutions will present you with an information pack about the house and product warranties.

TR Building Solutions will explain the maintenance period and the conditions of your Warranties.




If you are wondering what happens through each stage of the building process, here are the basic steps to completing your Extension.






Builders


Join our mailing list

Building-Builder-Best-Inner West-Eastern Suburbs-North Shore-Lower North Shore

Telephone: 02 8324 7517 

Office's Pyrmont (Sydney) and

Mount Hutton (Newcastle)

Copyright © TR Business Solutions Pty Ltd.  Design and Images by Mr Bota & Co.
Building Builder Best Inner West Innerwest CBD City Eastern Suburbs North Shore Lower North Shore carpenter houses house renovation narrow block re build extension attic basement concrete carport custom kitchen bathroom quality price value award winning Master Builder home development plans drafting engineering  2000 Australia Square Post Office 2000 Circular Quay 2000 Clarence Street Post Office 2000 Cockatoo Island 2000 Darling Harbour 2000 Dawes Point 2000 Garden Island 2000 Grosvenor Place Post Office 2000 Haymarket 2000 Millers Point 2000 Parliament House Sydney 2000 Railway Square Post Office 2000 Royal Exchange Post Office 2000 Spectacle Island 2000 St James 2000 Sydney South 2000 Taylors Square 2000 the Rocks 2000 the Rocks Sydney 2006 Sydney University 2007 Broadway 2007 Ultimo 2008 Chippendale 2008 Darlington 2009 Pyrmont 2010 Darlinghurst 2010 East Sydney 2010 Surry Hills 2011 Elizabeth Bay 2011 Kings Cross 2011 Potts Point 2011 Rushcutters Bay 2011 Woolloomooloo 2012 Strawb